How Long Does It Take an Electrician to Wire a New House

Source: pexels.com

Can you imagine your life without electricity? Neither do we! If you are planning to move into a new house soon, it is certain that you will want to completely wire your new home and ensure that you have an optimal electrical network that will allow you to function smoothly.

For these purposes, it will be necessary to hire an electrician who knows what he or she is doing and who will ensure that the part of the work related to electricity is completed as soon as possible. But how long will it take an electrician to wire your new house? Are we talking about days, weeks, or months? Find out below.

What you need to know before you start

Source: piqsels.com

House wiring takes place during the construction process and it is very important that the electrical network is optimally planned so that the whole wiring process is completed as soon as possible, but also to avoid problems after you move in. Electrical engineers have been working with contractors from the very beginning and in agreement with them, the contractors are working on the project of building your home.

When it comes time to wire your house, the electricians will perform this process in a few days or weeks, depending on the house itself. It is important for you, as a homeowner, to gather basic information about the whole wiring process in order to better understand your options, but you can also plan to make changes to the electricity grid in the near or distant future.

What are the phases of wiring a house?

1. Installation of temporary power sources

Source: pexels.com

When work on the house begins, it will be necessary to install an electric power source to ensure the operation of construction machinery and various equipment. Please note that these are only temporary power sources, which will be removed after the works reach the wiring part. After that, the entire electrical network is set up, which is planned in detail before any construction work has started.

2. Rough work

Source: piqsels.com

The next step is the rough work that starts after the house is built. Wiring and electricity are installed and routed to various electrical appliances and devices that you will use in your home. This part also includes the installation of lights, switchboards, etc.

3. Details

Source: piqsels.com

The next stage involves setting up receptacles and switches, and then installing various devices. This part is always left to the end for preventive reasons, so as not to cause any damage to the apparatus and device during the wiring process. The next phase is testing, which completes the electrical work on the house.

4. Testing

Source: piqsels.com

And finally, when all the work is done, the testing is performed to check if the wiring job is done properly and if all the appliances and devices are working. This part is carried out by both the electrician and the homeowners. Once you determine that everything is OK, the electrician will finish their work and give you a warranty for a certain period of time, in case something breaks.

How long will all of this take?

Source: piqsels.com

The length of the wiring process depends on two main factors. The first is the size of your house, and the second is the dexterity of the electrician. On average, wiring of the house lasts between 3 and 10 days, but it is best to consult with your electrician and hear their assessment to know what to expect.

We suggest you choose reliable and professional Honolulu Electrical Services to ensure that the whole process is completed quickly and in the best way possible.